Pekerjaan Marine Survey Sistem Kominikasi Kabel Bawah Laut (SKKL) Total survey route covering 790 km from land fall to maximum 3,450m water depth

Navigation & Positioning Services onboard “ASEAN PROTECTOR” & Anchor Handling Tug for APG Hong Kong and Sarawak Malaysia

Proposed Geophysical Survey For PDPT Pengerang Johor Malaysia (Jetty 2) Monthly Multibeam Survey

Marine Fibre Optic Cable Route Survey for Palapa Ring Paket Barat Indonesia Total 400km

Navigation and Positioning Services onboard “ASEAN PROTECTOR” and Anchor Handling Tug For Proposed New Cable Installation Project in Indonesia

NSRP Project/ Barge Positioning Survey & Touchdown Monitoring Survey & Post Construction Survey in Vietnam

Navigation & Positioning Services onboard “ASEAN Protector” & Anchor Handling Tug for Proposed New Cable Installation Project in Papua Irian Indonesia (Sulawesi Papua Cable System) SMPCS Project

Pekerjaan Freespan Correction (ROV) from Sumatra to Jawa

Bathymetry Survey Services at North Madura, Indonesia

Navigation and Positioning Survey Services for Cable Installation Work In Indonesia

Hydrographic & Seismic Survey for Proposal Terminal At Pulau Janda Berias Batam Riau Indonesia

Pipeline Route Pre Installation Survey for PT Timas Balongan Pipeline Project Ceribon Indonesia

Surface and Underwater Positioning Services for B.Oceania Salvage Project

EPC Contract for Site Preparation, Associated Works & Dredging for Independent Deepwater Petroleum Terminal in Pengerang, Johor, Malaysia

Navigation and Positioning Services for Submarine Pipeline Free Span Correction Survey at Thailand

Seismic Boomer Survey Off Myanmar Water

Navigation & Positioning Services For Submarine Pipeline Free Span Correction Survey at Sumatra Jawa Indonesia

Cable Installation & Cable Repair and Cable Route Survey(2 Years Contract)

Multi Beam Echo Sounding Survey off West of Karimun

Barge Navigation and positioning survey services for Pembinaan Logi Air Beaufort Fasa II dan Pemasangan Paip Dasar Laut Logi ke Labuan Malaysia

Positioning and Navigation survey services for Pipeline of Devil Creek Perth Australia Project

Ship Wreck Survey Off Myanmar

Complementary Multibeam & Vibrocore Campaign for Karimun Yard Construction Project

Navigation & Positioning services on board “Cable Protector” for Asia America Gateway Project, segment 1 and segment 2 cable systems installation, Hong Kong

Navigation and positioning services for SJJK Project in Surabaya, Indonesia

Vibro Coring sand search survey services off South Thailand Coastal (70 sq.km)

Navigation and Positioning Services of AAG Fibre Optic Cable Installation on Board “Cable Protector” Batam Indonesia to Changi Singapore

Positioning Survey Services for KODECO Grisik Surabaya Indonesia Post Trenching Pipeline Project on Board Eastern Trencher Barge

Multi Beam Side Scan Sonar Seismic/Vibro Coring for VSNL-IA TSS TYCO Communication USA Fibre Optic Cable Pre-Route Survey Singapore- Indonesia and Malaysia Water

Seismic Survey Sand Search for PT Saipem at Karimun

SBM Udang Field Offshore West Natuna, Indonesia

Positioning Survey Services for Total Fina Sisi Nubi Indonesia Post Trenching Pipeline Project on Board ASL 27 Barge

Desk Top Study, Pre Engineering & Vibro Coring (70Nos), Installation and Post Installation Survey from Batam (Indonesia) to Sungai Rengit (Malaysia) for 68kilometre of Fibre Optic Cable Route

Fabrication Yard Facilities Development Project at Batam/Karimun Proposed Navigation Channel

Desk Top Study,Pre Engineering & Vibro Coring (78Nos),Installation and Post Installation Survey for Moratelindo Fibre Optic Cable, Batam,Indonesia to Singapore 67km Route

Pre Hydrographic, Navigation & Positioning Services and As laid Pipeline Pingger Survey for Gas Transmission and Distribution Project West Jawa to Sumatra, Indonesia Phase 1

Pre Engineering, Inspection, Repair & Maintenance (R.O.V) Gas Pipeline West Natuna Transport System For M/s Conocophillips, Indonesia

Positioning R.O.V and Barge Management for Total – Fina Vietnam Wellhead Inspection and Cleanup Underwater Survey

PTT Third Transmission Pipeline Post Trenching & Backfilling 44” Pipeline Project at Thailand

Barge Positioning System for Total Fina ELF Tunu Phase 9 Project, Samarinda Indonesia